DIGGING BOSTON 1994 - 2006
Foating tunnel sections are moored in the channel waiting to be submerged to form the I-90 tunnel under Fort Point Channel. The CASTING BASIN is being drained so the remaining two sections can be cast.
May 2000
Foating tunnel sections are moored in the channel waiting to be submerged to form the I-90 tunnel under Fort Point Channel. The CASTING BASIN is being drained so the remaining two sections can be cast.
May 2000